05/13/2008 09:17:18  Temp. 36.8  F Humidity 99  % Wind SSW at 0  mph Barometer 29.829 +  in Rain 0.10  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

May House Project Notes

Leveling the House

Once the footers were dry and ready to work the forms were removed and the work to install floor jacks and replace the wooden posts started. The resulting system must be exactly level. Here is the transit set up to make sure the house could be leveled properly.

Transit

Jacks are installed and the posts are removed.

House Jacks

House Jacks

House Jacks

House Jacks

This is what it looked like at the end. All level and ready for the block wall to start.

House Jacks

Because we are adding a radiant floor heating system we needed to beef up the whole floor to handle the extra weight. Here is a picture of one of the 48 foot manufactured beams that are going under the floor for added support. The cider press shed in the background is going to be removed and the garage put in its place.

Floor Beam