05/12/2008 01:42:18  Temp. 48.6  F Humidity 36  % Wind N at 10  mph Barometer 29.402 -  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

May House Project Notes

Attaching House to block wall

The house is actually attached with a final layer of blocks above the poured concrete beam. Here the blocks are being installed.

Insulation

Insulation Layer

The foundation is composed of several layers. After the block course there is a section of styrofoam insulation. Here is the insulation layer and second blcok course going in.

Insulation

Installing Second Course Blocks

Here is what the foundation looks like ready for the final stone work.

Blocks

Blocks

Cider Shed Demolition

The old apple cider shed on the west side had to be demolished. The next side was dug out for the foundation work.

Demo Cider Shed

Blocks

Blocks

Blocks