03/13/2010 23:37:18  Temp. 40.2  F Humidity 61  % Wind NE at 0  mph Barometer 30.035 -  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

June House Project Notes

Digging the Foundation for the Garage

Now that the house foundation is mostly done the next step is the garage. Here the foundation is dug out.

Garage Foundation

Garage Foundation

Drains on Uphill Side

Uphill from the house we are adding a french drain to prevent water damage to the new foundation. Here is the east and north side drain pipe.

East Side Drain

North Side Drain

Once the drain pipe is in, and covered with rock and a soil barrier material it is backfilled and packed down.

East Side Drain

Deck Foundation

We have a deck planned for the south and east sides of the house. Here the pier footings are being set for the concrete piers for the south side deck.

South Deck Piers

Deck Piers

Deck Piers

More details on the footings for the piers. Once the footing is in place a sonotube is put on top and the whole thing braced for backfilling the foundation.

Deck Piers

Deck Piers

Deck Piers

Deck Piers

Deck Piers

Backfilling Foundation

Backfilling Foundation