05/09/2008 07:07:18  Temp. 40.3  F Humidity 71  % Wind NNE at 2  mph Barometer 29.723 -  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

June House Project Notes

Drains in Garage Floor

The garage is a three car with workshop space. One feature is the drains in the floor where each car space is located.

Digging for Drains

The drains are installed on a bed of sand and gravel.

Sand and Gravel

Showing the layout of the drains.

Drain Pipes

Drain Pipes

Drain Pipes

After the drains are installed the floor is leveled and guides for the concrete are laid. These guides will allow the floor to be sloped properly to the drains.

Floor Slopes

The equipment room, where the boiler for the in-floor radiant heat system, water pump, phone and data wiring cabinet and so on must be raised. This section is where that room will be located.

Equipment Room

The original entrance to the crawlspace was near the equipment room but it has been moved now.

Crawl Entry