09/07/2008 12:42:18  Temp. 74.2  F Humidity 19  % Wind SSW at 7  mph Barometer 30.242 -  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

June House Project Notes

Near Final Grade

To reduce the chance of hitting the framing and while the big bulldozer was on site Bill McKee did a lot of the grading. While not final, it is very close.

Moving Dirt

One problem was where to put all the dirt that is left over. Some went into the center section to improve the ground there. We hiope to eventually plant this with grass.

Moving Dirt

Some was put down a washed out lane from the house to the barn.

Moving Dirt

The back of the house now has a swale ditch to move the water from the orchard around the house rather than underneath it.

North Side Swale Ditch

North Side Swale Ditch

The east side also slopes down. Here is where one side of the deck will be.

East Side

The front entrance is starting to take shape now.

Front View

Here is what it looks like after the dirst had been spread in the center of the driveway.

Front View