|

Top of Site
Garvin Mesa Weather
Desert Weyr: Our Farm
Sales List
Black Welsh Mountain Sheep
CMK Arabian Horses
Geese and Chickens
Hops Variety Research Project
Desert Weyr Blog
General Sheep Info
General Horse Info
Personal
Gordon-Van Tine Kit House Restoration
Hummer Information
Ken & Oogie
Colorado House Project
Mount Lamborn Picture Gallery
16870 Garvin Mesa Road
Paonia, CO 81428
(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time
Email at sales@desertweyr.com
|
August House Project Notes
Outside Siding Started
Trim pieces above the foundation but below the siding are installed.

View from the back of the house with all the trim in place.

Sawing the siding.

The siding is partially installed on the Garage. Also one of the small people doors has been installed.


Bill McKee checking plans to be sure things are going together correctly.

The beam that was removed from the center of the house because it was warped and cracked has been resawn to become the fireplace mantle. Here it is installed on the supporting metal brackets.

Decorative wooden brackets are installed over the metal ones.

Go To Top
|